Buy With Confidence

No Hassle | Just Help

We Match All Legitimate Prices

Order by 2PM EST (Exclusions Apply)

We Know Diesel Trucks & Equipment
REMAN 7.3 Powerstroke E-Series Garrett GTP38 Turbocharger | 706448-5006, 706448-9006 | 1999.5-2003 Ford Powerstroke 7.3L
706448-5006
Cross Reference Numbers
1700250344, 170-025-0344, 1700702703, 170-070-2703, 1831452C95, 1831458C91, 2T209, 2T-209, 5010015R92, 57769900001, 5776-990-0001, 7020130006, 702013-0006, 7020130008, 702013-0008, 7020130010, 702013-0010, 7020135006, 702013-5006, 7020135008, 702013-5008, 7020135010, 702013-5010, 7020135010S, 702013-5010S, 7020139006, 702013-9006, 7020139008, 702013-9008, 7020139010, 702013-9010, 7064480001, 706448-0001, 7064480006, 706448-0006, 7064485001, 706448-5001, 7064485006, 706448-5006, 7064489001, 706448-9001, 7064489006, 706448-9006, DA2251343, TC10RM, TC-10-RM, TC10-RM, TP380021, TP38-0021, XC256K682AB, XC2Z6K682AA, XC2Z-6K682-AA, XC2Z6K682AARM, XC2Z-6K682-AARM
1 Year unlimited mileage warranty
Pricing:
$1195.95
Description
Completely Remanufactured Garrett Ford 7.3L PowerStroke turbocharger for E-Series vehicles by a third party in the USA. We stand behind our products with a Full 1 Year Warranty unlimited Mileage.
FEATURES:
- Remanufactured In the US
- Low Core Charge.
- Fully Rebuilt, Balanced and Tested
ANY FOREIGN OBJECTS LEFT IN THESE AREAS CAN FATALLY DAMAGE THE TURBOCHARGER AND MAY CAUSE DAMAGE TO THE ENGINE! INSPECT AND PREP– NEW TURBOCHARGER
- Ensure that no dirt or foreign objects have entered the turbocharger openings.
- Place new o-ring and gaskets on oil inlet side of turbo, use clean engine oil to lubricate o-rings before assembly.
TURBOCHARGER INSTALLATION:
- Install turbocharger, mount both rear and front side, using high temperature nickel anti-seize lubricant to the bolt threads.
- Position all wire retainers and install bolts.
- Lubricate turbocharger by pouring clean engine oil into the oil inlet hole of the turbo. With your fingers, spin the compressor wheel several times to coat the turbocharger bearings with oil. Pour more oil into the oil inlet hole to top it off. There may be some drainage, but this is of no concern.
- Connect the oil supply line, position the oil feed tube and install oil inlet bolts.
- Connect the air cooler duct inlet, installed with v-band clamp.
- Connect the air exhaust duct, installed with v-band clamp.
- Check for proper crankcase oil level.
- Test to prevent “engine start – fuel shut off”: crank the engine for a short duration of 15 seconds until the gauge shows an oil pressure build up.
- Start the engine and let it idle for 5-10 minutes. (Do not rev the engine during this time)
- Inspect installation for any oil leaks.
- Have a question? Ask the Pros
- Email UsGet answers from the pros
- 1-844-487-2787Mon-Fri 9am-6pm EST